Position and level
Pan set level and aligned to the waste outlet centre for proper drainage

Farwaniya
Western toilet installation in Khitan Al-Jadida starts with checking the floor location and measuring the existing waste opening. We level the floor with cement packing if needed, then seal the waste connection tight, run cold supply to the cistern and test the full flush cycle.
Most Khitan Al-Jadida houses are modern villas with tiled bathrooms and standard floor waste outlets. We measure from the waste opening to the wall to pick the correct pan size, and check the fall on the existing pipe before fixing because weak fall causes blockages easily. We choose the seal material based on tile type and floor angle to achieve lasting watertightness without moisture under the pan.
Khitan Al-Jadida lies in Farwaniya governorate, a modern residential expansion area distinguished from Old Khitan by its even horizontal waste layout.
We test each waste joint by filling the cistern and running ten consecutive flushes to check for leaks underneath.
Pan set level and aligned to the waste outlet centre for proper drainage
Wax ring or rubber gasket fitted between pan base and the floor outlet flange
Braided flexible supply tail and a dedicated isolation valve fitted to the cistern
Cistern mounted and float valve adjusted for correct fill level and full flush
Sanitary silicone bead around the pan base stops water tracking under the tile
Multiple flush cycles run immediately after fitting to confirm all joints are dry
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure the distance from the floor waste hole to the nearest front wall. If less than 65 cm, we use a compact pan; otherwise the standard size offers more comfort and easier flushing.
Usually the seal failed because of incorrect floor angle or uneven tiling underneath. We ensure the pan base rests fully on a level line before final bolt tightening.
