Wall position check
Marking the correct height and anchor points before any drilling

Ahmadi
Wall-hung basin installation in Shuaiba Industrial starts by finding the right height above a workstation or control room. We mark the concrete wall, run supply and waste lines, test pressure and check for leaks before handover.
Operations centers and engineering offices in Shuaiba have thick concrete walls that need strong drilling to fix the brackets. We check the wall for compressed air pipes or data cables before drilling, because these lines are critical to site operations. The waste slopes down from the basin toward main drains that run under the screeded floor.
Shuaiba Industrial sits in Ahmadi governorate, a complex area of refineries and processing plants where basins are placed in work zones and monitoring stations.
Before completion, the tap is opened fully under operator watch to confirm clean flow and fast drainage.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use a metal detector and wire finder before any holes are drilled. We ask site staff about recorded lines and notify health and safety of where we are working.
We choose angled brackets or lift the basin higher to clear the pipes. If space remains tight, we suggest a narrower wall-mounted model instead.
