Crack welding
direct thermal weld along each fracture line in the tank wall

Ahmadi
Tank welding at Shuaiba Industrial tackles cracks and failed joints in large plastic and fibreglass tanks. We locate the break with initial dry inspection then drain the tank partly and shield the weld zone with protective cloth. We scour the surface with a wire brush, fill the crack with high-temperature resin and test the seal under full pressure before returning to service.
Shuaiba Industrial has massive feed tanks for desalination towers and steam boilers mounted on concrete plinths in open air. These tanks expand and contract in intense heat, salt spray and humidity, so cracks appear first around inlet and outlet ports. We inspect each bolted joint and every bend in the inlet pipes because uneven pressure causes intermittent leaks that are hard to trace. Welding fine cracks before they widen stops water loss and prevents salt deposit entering the system.
Shuaiba Industrial lies in Ahmadi governorate and hosts desalination complexes and refineries where water tank integrity is vital to continuous operation.
We wait three hours after welding before refilling because the resin needs time to cure fully in intense heat.
direct thermal weld along each fracture line in the tank wall
re-welding inlet and outlet fittings where the flange joint has failed
resin-and-mat layer over the damaged zone before the final weld seal
internal camera after welding reveals any weak point before refilling
replacing the tank lid when the leak source is the cover seal
written record of weld locations and camera inspection result
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, the weld area must be completely drained and dried. We lower the level well below the crack for at least two hours, then allow air to circulate and dry the surface fully.
Once is usually sufficient if the crack is fine and the weld penetrates deeply. If it cracks again, the plastic tank may be aged and replacement becomes safer than repeated repairs.
