Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Farwaniya
Roof tank installation in Firdous begins with checking the concrete slab strength under additional load. We align the tank with load-bearing walls, run supply waste and ventilation pipes, then test pressure at a known rating before handover.
Firdous houses are modern with thick concrete slabs waterproofed and roofs typically used for drying and lines. The slab is strong enough for a tank without props if we place it over strong areas, that is over long walls and main columns. Supply draws from the main meter at ground level or a roof tap if it exists, and waste runs down the old vertical stack to an underground collection pit or lift station.
Firdous in Farwaniya is a modern residential zone near Firdous Co-op and the Sixth Ring Road, with most houses built in recent decades.
Before handover the tank is run from full to half-full while pressure drop is monitored for thirty minutes to detect hidden leaks.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, the vent draws air during filling and prevents a vacuum forming. We run it thirty centimetres above the tank and end with a low-spray strainer cap.
We open the stack from the top and clear the blockage with an air gun or auger. If it is cracked we run a new plastic pipe beside it from roof to pit.