Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
An underground tank at Zour power station stores fresh and treated water for cooling massive electricity generators. We excavate cautiously in flat desert ground away from surrounding heavy equipment, then build a sealed tank with safe drainage systems.
Zour power station depends on giant water tanks for constant generator cooling, and an underground tank reduces evaporation that occurs in open tanks. The soil is fine sand with salt layers, and deep excavation needs side support to prevent wall collapse. After building the tank, we test it under full water pressure to ensure no seepage during full-power generation operations.
Zour sits in Ahmadi governorate near the power generation plant and requires reliable tanks with massive capacity.
The tank is covered with a concrete roof instead of remaining open because fine sand and strong winds contaminate stored water.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, we relocate the tank away from heavy equipment lines. We review the plant layout first and choose a safe spot clear of generators and main pipelines.
We apply multiple waterproofing layers with concrete, bitumen and ceramic protection coating. The roof is tightly sealed and inlet pipes have filters fitted.