Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Farwaniya
An underground tank near Andalus Co-op requires planning to avoid adjacent foundations and power cables. We construct thick concrete walls, insulate the base with a cement layer, slope it for drainage and fill the tank gradually while monitoring wall pressure.
The area around Andalus near the Fourth Ring Road has high residential density and closely-spaced villas. Tanks here are built to limited depth because underground power and water lines fill the space. We use reinforced concrete support columns under the ground rather than digging very deep and choose locations away from line crossings. Every concrete joint is carefully checked before waterproofing because even hairline cracks allow seepage.
Andalus is in Farwaniya governorate near the Fourth Ring Road, a congested residential zone with many underground utilities.
Both supply and drainage are graded so water speed does not exceed one meter per second, avoiding flow noise in confined tanks.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes provided there is enough space around the site for work and excavation. We use collapsible steel formwork instead of timber and install walls faster in tight spaces.
Work stops immediately and we contact the power company to map the exact route and depth. We shift the tank location if possible or go below the cable at an official safety distance.
