Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Farwaniya
An underground tank in Rai Industrial serves factories and warehouses requiring high-volume water. We survey the site to set excavation dimensions and depth based on production needs. Reinforced concrete pouring is precise to handle constant pressure. Full waterproofing and pressure testing deliver a reliable tank for industrial use.
Industrial facilities in Rai require continuous water flow and cannot tolerate supply cuts. A large underground tank provides backup for several hours of production. Positioning beside the main building minimizes distribution pipelines and loss. We dig at depth suited to existing water levels and use thicker concrete to withstand repeated pressure cycles. Drain and inspection openings are designed for routine maintenance and testing.
Rai Industrial is in Farwaniya governorate, an industrial zone adjacent to The Avenues Mall complex where heavy facilities and warehouses concentrate.
We review water, electrical and sewer lines from site management before finalizing the excavation location.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we design the tank with a fresh water section and a separate emergency reserve. An internal dividing wall allows each section to be maintained independently.
We strengthen the tank foundation with thick concrete and position heavy equipment at safe distance from the excavation. An engineer evaluates soil bearing capacity to specify required wall thickness.
